Главная> Блог> How to Weak Electric Wires (8 steps)

How to Weak Electric Wires (8 steps)

March 21, 2023
1. Determine the location of weak-wire indoor access points
In this link, the owner needs to inform the designer of his own habits and functional requirements. If the TV is installed in the bedroom, it needs to be installed on the wall of the bedroom's TV signal cable; if the computer is used in the study, it needs to be in the study room. The network interface is installed on the wall; installing a telephone in the bathroom requires that the access point of the telephone line be led to the wall of the bathroom.

2, spring wire <br> <br> shells line using a dip i.e. ink line, ground shells or wall, it is used to determine the role of the weak line position away from the line between the tank to the access weak points, The late buried line provides a reference.

3, shaving groove <br> <br> traces the path, the wall in the excavated groove for Buried pipe line, it is noted that the steel must not damage the inner wall of the groove during shaving.

4, during embedded <br> <br> Buried conduit lines, the bared wire directly prohibited Buried in the wall, the pipe line is required. The line pipe usually used for buried lines is divided into two types: PVC line pipe and galvanized iron line.

5, the start threading <br> <br> be Buried television signal lines, telephone lines, cable and other weak pulling from the tank to the conduit, through the conduit until the final wall interface.

6, the line is smooth acceptance <br> <br> after threading is completed, it needs to be worn with a multimeter and other equipment for the wire acceptance, view the line is smooth, whether there is a break or short circuit.

7, mounting panel <br> <br> in the overall renovation project is completed, weak line interface installed on the wall of the corresponding panel.

8, the cover projects <br> <br> borehole, after the threading, grooves need to be covered with shaving, shaving groove wall for example, the required slot is closed caulking plaster, and then caulking strip firmly affixed, and then After the wall decoration. For ground shaving, cement mortar is used to fill and level the tank, followed by normal floor or floor tiles.

After completing the above eight steps, the owner can set up corresponding businesses in cable television companies, network communications companies, telephone stations and other departments, connect corresponding signals, and install corresponding equipment for use.
Связаться с нами

Author:

Ms. Amy

Электронная почта:

amy@ucoax.com

Phone/WhatsApp:

+8613913156783

Популярные продукты
Новости промышленности
You may also like
Related Categories

Письмо этому поставщику

Тема:
Электронная Почта:
сообщение:

Your message must be betwwen 20-8000 characters

Связаться с нами

Author:

Ms. Amy

Электронная почта:

amy@ucoax.com

Phone/WhatsApp:

+8613913156783

Популярные продукты
Новости промышленности

Контакты

  • Номер Телефона : 86-0512-66610280
  • Мобильный Телефон: +8613913156783
  • Электронная Почта: amy@ucoax.com
  • Адрес Компании : NO.288 HUAFENG ROAD, Suzhou, Jiangsu China

Отправить Запрос

Список сопутствующих товаров

Подписывайтесь на нас

Copyright © 2024 UCOAXВсе права защищены.
We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Отправить